• DocumentCode
    1177234
  • Title

    Equipment Qualification: The Process for New Plants as Seen by a Utility

  • Author

    Porter, Newell S.

  • Author_Institution
    Washington Public Power Supply System
  • Issue
    7
  • fYear
    1984
  • fDate
    7/1/1984 12:00:00 AM
  • Firstpage
    1654
  • Lastpage
    1655
  • Abstract
    The qualification process, based on the experience an electric utility gained through its efforts to meet the requirements of IEEE Standards 627-80 and 323-1974 and the attendant regulatory guidance for new plants, is presented. Important aspects of each step from initial plant design to maintaining equipment qualification during operations are described. Although all these steps are not directly applicable to near-term and operating plants, the guidance offered is generally appropriate for procurement of qualified spare and replacement parts and for plant modifications of safety systems.
  • Keywords
    Design engineering; Nuclear power generation; Power generation; Power industry; Power supplies; Procurement; Qualifications; Safety devices; Senior members; Testing;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/TPAS.1984.318648
  • Filename
    4112725