  • Abstract
    Task Force 14-1 was formed within the Insulated Conductors Committee (ICC) to investigate the appropriateness of the guidance presented in IEEE standards addressing design and installation of cable systems in power stations, in light of recent testing by installation contractors and cable manufacturers, as well as comments by various members. A survey questionnaire was circulated to all of the ICC to determine areas in which either current practice differs from the IEEE standards of differing opinions exists in aspects of cable installation not currently covered. Survey results highlighted a need for investigation and recommendation on specific cable installation practices. Additional data were gathered from cable manufacturers, utilities, and engineering firms. Recommendations and information obtained by the committee are presented
  • Keywords
    installation; power cables; power stations; standards; IEEE standards; installation; power cables; power stations; recommended practice; testing; utilities; Cable insulation; Communication cables; Conductors; Ducts; Insulation testing; Manufacturing; Marine animals; Monitoring; Power cables; Power generation;
  • fLanguage
    English
  • Journal_Title
    Power Delivery, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8977
  • Type

    jour

  • DOI
    10.1109/61.32636
  • Filename
    32636