DocumentCode
1200804
Title
Closure on "Adaptive noncommunication protection for power lines BO scheme 2 - the instant operation approach"
Author
Bo, Z.Q.
Volume
20
Issue
1
fYear
2005
Firstpage
538
Abstract
For original article by Z.Q. Bo see ibid., vol.17, no.1, p.92-6, January 2002 and for discussion by M.M. Eissa see ibid., vol.20, no.1, p.538, January 2005.
Keywords
circuit breakers; electrical faults; power cables; relay protection; adaptive noncommunication protection; breaker opening; instant operation approach; internal fault; line capacitance; permanent fault; power line protection; relays; remote circuit breaker; transient faults; voltage drop; voltage level detector; Circuit breakers; Circuit faults; Communication channels; Digital relays; Fault detection; Fault diagnosis; Power system protection; Protective relaying; Signal processing; Voltage;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/TPWRD.2004.835379
Filename
1375142
Link To Document