DocumentCode
1202122
Title
Integrated scheduling of flexible manufacturing systems employing automated guided vehicles
Author
Lee, Doo Yong ; DiCesare, Frank
Author_Institution
Dept. of Precision Eng. & Mechatronics, Korea Adv. Inst. of Sci. & Technol., Taejon, South Korea
Volume
41
Issue
6
fYear
1994
fDate
12/1/1994 12:00:00 AM
Firstpage
602
Lastpage
610
Abstract
Centralized and distributed automated guided vehicle system (AGVS) models for materials handling, and the model for part processing are integrated into a single coherent model. This formulation can be used to collectively schedule and control the entire flexible manufacturing system (FMS) as opposed to the traditional separate scheduling of part processing and material handling. The two AGVS models are based on Petri nets and can be directly used in the scheduling method that uses Petri nets for formulation and heuristic search for solution. This method employs a global search to seek the optimal operation of an entire FMS. Scheduling examples are presented and the method compares favorably with the results simulated using heuristic dispatch rules
Keywords
Petri nets; automatic guided vehicles; centralised control; control system analysis; control system synthesis; distributed control; flexible manufacturing systems; heuristic programming; materials handling; optimal control; production control; search problems; AGV; FMS; automated guided vehicles; centralized control; distributed control; flexible manufacturing systems; formulation; global search; heuristic dispatch rules; heuristic search; integrated scheduling; optimal operation; part processing; simulation; solution; Automatic control; Control systems; Dispatching; Flexible manufacturing systems; Job shop scheduling; Materials handling; Modeling; Petri nets; Routing; Vehicles;
fLanguage
English
Journal_Title
Industrial Electronics, IEEE Transactions on
Publisher
ieee
ISSN
0278-0046
Type
jour
DOI
10.1109/41.334577
Filename
334577
Link To Document