• DocumentCode
    1228202
  • Title

    Planning Aspects of Automatic Test and Checkout in Missille and Space Systems

  • Author

    Mast, L.T.

  • Author_Institution
    The Rand Corporation
  • Volume
    1
  • Issue
    2
  • fYear
    1963
  • Firstpage
    1056
  • Lastpage
    1063
  • Abstract
    The degree of automation applied to test and checkout should be controlled by: (1) R&D nature of the end item program (2) Fixed program character of the state-of-the-art in automation (3) Test plan Within the scope of these basic considerations, a tradeoff should be performed among manual, semi-automatic, and automatic equipment. Certain inherent limitations of man and machine are provided. If automation is to be employed, a system design should be selected, interfaces defined, and selective implementation started in the R&D phase.
  • Keywords
    Aerospace testing; Automatic testing; Automation; Circuit faults; Circuit testing; Land vehicles; Performance evaluation; Research and development; Road vehicles; System testing;
  • fLanguage
    English
  • Journal_Title
    Aerospace, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0536-1516
  • Type

    jour

  • DOI
    10.1109/TA.1963.4319478
  • Filename
    4319478