DocumentCode
1250645
Title
Overhead lines for the Supergrid
Author
Reading, A.G.
Volume
19
Issue
15
fYear
1973
Firstpage
352
Lastpage
356
Abstract
The law of the land requires that the CEGB maintains an electricity supply suitable for Britain´s needs. Transmission lines are a part of the supply network that people notice most, but few realise the time scale involved in planning and building a grid network. This article examines the technical aspects of Britain´s 400 kV transmission system¿better known as the Supergrid.
fLanguage
English
Journal_Title
Electronics and Power
Publisher
iet
ISSN
0013-5127
Type
jour
DOI
10.1049/ep.1973.0438
Filename
5180873
Link To Document