• DocumentCode
    1259601
  • Title

    The management of large high-technology projects

  • Author

    Peddie, R.A.

  • Volume
    22
  • Issue
    7
  • fYear
    1976
  • fDate
    7/1/1976 12:00:00 AM
  • Firstpage
    419
  • Lastpage
    422
  • Abstract
    The design and construction of a modern commercial power station is a very large undertaking. Such projects cost between £100 million and £1000 million, and the economic pressure to reduce first costs and improve thermal efficiency and manpower utilisation has led to power stations becoming very large and extremely complex with many of their design features at the very limit of current technology. As their lead times are invariably longer than the rate of change of technology, commitment to technological advances has often to be made before significant operating experience has been obtained. This is not wrong in itself but it means that very sophisticated management is required to produce reliable plant
  • fLanguage
    English
  • Journal_Title
    Electronics and Power
  • Publisher
    iet
  • ISSN
    0013-5127
  • Type

    jour

  • DOI
    10.1049/ep.1976.0211
  • Filename
    5182869