• DocumentCode
    1262691
  • Title

    The maintenance of voltage on a d.c. distribution system by means of a fully automatic substation

  • Author

    Robinson, P.J.

  • Volume
    61
  • Issue
    317
  • fYear
    1923
  • fDate
    4/1/1923 12:00:00 AM
  • Firstpage
    417
  • Lastpage
    424
  • Abstract
    The paper describes the considered methods of meeting a particular case of, voltage-drop in a large direct-current lighting network and for bringing into use the maximum amount of its copper with a minimum of cost. A fully automatic station was chosen in this instance for the reasons stated, and the author in discussing the subject has not attempted to review the relative merits of different types of automatic stations; but rather the method of dealing with a particular problem, and with this end in view has described the station which has come under his immediate control. So far as the author is aware, the plant described is that of the first fully, automatic, station in this country, for any purpose, and of the first fully automatic station in existence operating a three-wire system.
  • Keywords
    electricity and traction works;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineers, Journal of the Institution of
  • Publisher
    iet
  • Type

    jour

  • DOI
    10.1049/jiee-1.1923.0057
  • Filename
    5312840