• DocumentCode
    1263173
  • Title

    Balance of System Costs for a 5 MW Photovoltaic Generating Station

  • Author

    Shushnar, G.J. ; Caldwell, J.H. ; Reinoehl, R.F.

  • Author_Institution
    ARCO SOLAR, Inc., Chatsworth, CA
  • Issue
    8
  • fYear
    1985
  • Firstpage
    29
  • Lastpage
    29
  • Abstract
    A cost study was conducted of a 12,200 megawatt-hour per year (5MW) photovoltaic generating station of various configurations using actual data and experience from ARCO Solar´s large-scale P.V. projects in California. Study results indicate that efficiency (area) related costs such as photovoltaic area, support structure, sitework and field wiring are 75% to 85% of the total cost of a P.V. power plant. The study identifies the areas where sufficient P.V. and balance of system (B.O.S.) cost reductions can be made to enable P.V. generating stations to become competitive with conventional generation.
  • Keywords
    Costs; Design engineering; Laminates; Large-scale systems; Lenses; Photovoltaic systems; Power engineering and energy; Power generation; Solar power generation; Wiring;
  • fLanguage
    English
  • Journal_Title
    Power Engineering Review, IEEE
  • Publisher
    ieee
  • ISSN
    0272-1724
  • Type

    jour

  • DOI
    10.1109/MPER.1985.5526373
  • Filename
    5526373