A cost study was conducted of a 12,200 megawatt-hour per year (5MW) photovoltaic generating station of various configurations using actual data and experience from ARCO Solar´s large-scale P.V. projects in California. Study results indicate that efficiency (area) related costs such as photovoltaic area, support structure, sitework and field wiring are 75% to 85% of the total cost of a P.V. power plant. The study identifies the areas where sufficient P.V. and balance of system (B.O.S.) cost reductions can be made to enable P.V. generating stations to become competitive with conventional generation.
Keywords
Costs; Design engineering; Laminates; Large-scale systems; Lenses; Photovoltaic systems; Power engineering and energy; Power generation; Solar power generation; Wiring;
fLanguage
English
Journal_Title
Power Engineering Review, IEEE
Publisher
ieee
ISSN
0272-1724
Type
jour
DOI
10.1109/MPER.1985.5526373
Filename
5526373
Link To Document