DocumentCode
127046
Title
Research on the project critical activity uncertainty risk assessment
Author
Zi-ling Xin ; Xing Pan
Author_Institution
Sch. of Reliability & Syst. Eng., Beihang Univ., Beijing, China
fYear
2014
fDate
27-30 Jan. 2014
Firstpage
1
Lastpage
6
Abstract
In the engineering project, critical activities may lead the system to huge risk and even failure. Probabilistic risk assessment is closely related to reliability analysis. This paper defines uncertainty importance measure of the project´s activities time and analyzes the specific analytical steps of uncertainty importance measure. Time may affect the whole project´s risk; meanwhile cost and other factors will also work. So this paper proposes a methodology for the researching on uncertainty importance risk analysis of time and cost jointly. The main steps are: (i) defining a covariance of the cost and time of the project activities; (ii) setting up the jointly uncertainty importance measure of cost and time; (iii) calculating the uncertainty importance and ranking the order of the critical activities by mathematics analytic method. An adapted case is studied to assess the proposed methodology.
Keywords
covariance analysis; failure analysis; project engineering; reliability; risk analysis; covariance; failure; mathematics analytic method; project critical activity; reliability analysis; risk analysis; uncertainty risk assessment; Mathematical analysis; Measurement uncertainty; Reliability; Stochastic processes; Time measurement; Transfer functions; Uncertainty; Cost and Time; Critical Activity; Jointly Uncertainty Importance; Risk Assessment; Uncertainty Importance;
fLanguage
English
Publisher
ieee
Conference_Titel
Reliability and Maintainability Symposium (RAMS), 2014 Annual
Conference_Location
Colorado Springs, CO
Print_ISBN
978-1-4799-2847-7
Type
conf
DOI
10.1109/RAMS.2014.6798470
Filename
6798470
Link To Document