Utilizing GOOSE-based protection schemes to attain compliance with regulatory testing requirements
Author
Preston, Richard ; Guerriero, Cesar
Author_Institution
Siemens, Wendell, NC, USA
fYear
2014
fDate
March 31 2014-April 3 2014
Firstpage
588
Lastpage
595
Abstract
A distinct challenge for any electric utility company, be it investor owned, publicly owned or a cooperative, is to be in compliance with regard to testing requirements of modern protective relays. Documented, periodic testing of relays and other IEDs (Intelligent Electronic Device) in power substations must be carried out in order to comply with the requirements of the local regulatory council.
Keywords
electricity supply industry; local area networks; power engineering computing; relay protection; relays; substation automation; transport protocols; GOOSE-based protection schemes; IED periodic testing; electric utility company; intelligent electronic device; power substation; protective relays; regulatory testing requirements; relays periodic testing; IEC standards; Open systems; Protocols; Relays; Switches; Testing; Computer Network Reliability; Ethernet Networks; IEC61850 Standard Ed2; Regulatory Testing Requirements; Substation Automation;
fLanguage
English
Publisher
ieee
Conference_Titel
Protective Relay Engineers, 2014 67th Annual Conference for
Conference_Location
College Station, TX
Print_ISBN
978-1-4799-4740-9
Type
conf
DOI
10.1109/CPRE.2014.6799030
Filename
6799030
Link To Document