• DocumentCode
    127555
  • Title

    Utilizing GOOSE-based protection schemes to attain compliance with regulatory testing requirements

  • Author

    Preston, Richard ; Guerriero, Cesar

  • Author_Institution
    Siemens, Wendell, NC, USA
  • fYear
    2014
  • fDate
    March 31 2014-April 3 2014
  • Firstpage
    588
  • Lastpage
    595
  • Abstract
    A distinct challenge for any electric utility company, be it investor owned, publicly owned or a cooperative, is to be in compliance with regard to testing requirements of modern protective relays. Documented, periodic testing of relays and other IEDs (Intelligent Electronic Device) in power substations must be carried out in order to comply with the requirements of the local regulatory council.
  • Keywords
    electricity supply industry; local area networks; power engineering computing; relay protection; relays; substation automation; transport protocols; GOOSE-based protection schemes; IED periodic testing; electric utility company; intelligent electronic device; power substation; protective relays; regulatory testing requirements; relays periodic testing; IEC standards; Open systems; Protocols; Relays; Switches; Testing; Computer Network Reliability; Ethernet Networks; IEC61850 Standard Ed2; Regulatory Testing Requirements; Substation Automation;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Protective Relay Engineers, 2014 67th Annual Conference for
  • Conference_Location
    College Station, TX
  • Print_ISBN
    978-1-4799-4740-9
  • Type

    conf

  • DOI
    10.1109/CPRE.2014.6799030
  • Filename
    6799030