• DocumentCode
    1277817
  • Title

    Transmission at 220 kv. on the Southern California Edison system: A symposium

  • Volume
    43
  • Issue
    11
  • fYear
    1924
  • Firstpage
    1025
  • Lastpage
    1026
  • Abstract
    Length of line was to be 275 miles. This was determined by the fact that the present Big Creek lines from Big Creek to Eagle Rock Substation are 243 miles in length and the lines from Eagle Rock to Laguna Bell Substation are 26 miles or a total length of 269 miles. Assuming that the future lines would terminate at Laguna Bell or in the same neighborhood, the round figure of 275 miles was used.
  • fLanguage
    English
  • Journal_Title
    A.I.E.E., Journal of the
  • Publisher
    ieee
  • ISSN
    0095-9804
  • Type

    jour

  • DOI
    10.1109/JAIEE.1924.6537783
  • Filename
    6537783