DocumentCode
1277847
Title
High fuel costs compel hydroelectric development
Volume
43
Issue
11
fYear
1924
Firstpage
1033
Lastpage
1033
Abstract
Electrical engineers in Germany are being forced by the high price of coal to utilize the nation´s waterpower resources to the fullest extent. The first hydroelectric plant in the Province of Brandenburg, located at Spremberg, started operating this year. The satisfactory results obtained have led to a survey of other possible power sites in this province and favorable places have been discovered at Wendisch-Buchholt, at Boden near Deichow, and at Lausitzer Neisse near Forst. The intentions are that work will be started on these plants as soon as economic conditions in Germany permit.
fLanguage
English
Journal_Title
A.I.E.E., Journal of the
Publisher
ieee
ISSN
0095-9804
Type
jour
DOI
10.1109/JAIEE.1924.6537788
Filename
6537788
Link To Document