Abstract
Planning for the commissioning of an industrial substation can be one of the most challenging jobs facing an electrical engineer today. The goal of any commissioning effort is to energize the equipment safely, in the time frame dictated by construction completion and process startup plans, while fulfilling all of the OSHA requirements. This must happen in a cost-effective manner. With the new equipment available and de-energised, and testing and manufacturer´s experts available, several additional opportunities present themselves. The commissioning window is an ideal time to train the site electricians and process technicians on the electrical system and establish baseline maintenance data for future trending of preventative and predictive maintenance. This article serves as a guide for the planning required to achieve the end goal of a safely commissioned substation, in the time required with the money budgeted. The different component parts that make up the commissioning plan can be simplified or expanded depending on the quality of the commissioning team, but the need for some level of documentation has clearly become essential with the involvement of OSHA in the commissioning steps
Keywords
commissioning; planning; safety; substations; OSHA requirements; industrial substation; predictive maintenance; preventative maintenance; process startup; safe equipment energisation; site electricians training; substation commissioning; turnover planning; Industrial training; Inspection; Management training; Manufacturing; Occupational safety; Packaging; Predictive maintenance; Railway safety; Substations; Testing;
fLanguage
English
Journal_Title
Industry Applications Magazine, IEEE
Publisher
ieee
ISSN
1077-2618
Type
jour
DOI
10.1109/2943.823193
Filename
823193
Link To Document