DocumentCode
1304890
Title
Project risk assessment using the analytic hierarchy process
Author
Mustafa, Mohammad A. ; Al-Bahar, Jamal F.
Author_Institution
Kuwait Inst. for Sci. Res., Safat, Kuwait
Volume
38
Issue
1
fYear
1991
fDate
2/1/1991 12:00:00 AM
Firstpage
46
Lastpage
52
Abstract
Construction projects often fail to achieve their time, budget, and quality goals. This is frequently due to the failure of the contractor to analyze and assess all risk factors. The analytic hierarchy process (AHP) is an approach that can be used to analyze and assess project risks during the bidding stage of a construction project and to overcome the limitations of the approaches currently used by contractors. The AHP provides a flexible, easily understood way to assist the decision-maker in formulating a problem in a logical and rational manner. A review of the AHP and a description of its application in the assessment of the riskiness of constructing the Jamuna multipurpose bridge in Bangladesh are included
Keywords
construction industry; AHP; Bangladesh; Jamuna multipurpose bridge; analytic hierarchy process; budget; construction project; project risk assessment; quality goals; Bridges; Construction industry; Failure analysis; Fuzzy sets; Project management; Risk analysis; Risk management; Subcontracting; Thumb; Uncertainty;
fLanguage
English
Journal_Title
Engineering Management, IEEE Transactions on
Publisher
ieee
ISSN
0018-9391
Type
jour
DOI
10.1109/17.65759
Filename
65759
Link To Document