DocumentCode
1307885
Title
Hydroelectric generation scheduling with an effective differential dynamic programming algorithm
Author
Chang, Shi-Chmg ; Chen, Chun-Hung ; Fong, I-Kong ; Luh, Peter B.
Author_Institution
Dept. of Electr. Eng., Nat. Taiwan Univ., Taipei, Taiwan
Volume
5
Issue
3
fYear
1990
fDate
8/1/1990 12:00:00 AM
Firstpage
737
Lastpage
743
Abstract
An effective multiplier method-based differential dynamic programming (DDP) algorithm for solving the hydroelectric generation scheduling problem (HSP) is presented. The algorithm is developed for solving a class of constrained dynamic optimization problems. It relaxes all constraints but the system dynamics by the multiplier method and adopts the DDP solution technique to solve the resultant unconstrained dynamic optimization problem. The authors formulate the HSP of the Taiwan power system and apply the algorithm to it. Results demonstrate the efficiency and optimality of the algorithm for this application. Computational results indicate that the growth of the algorithm´s run time with respect to the problem size is moderate. CPU times of the testing cases are well within the Taiwan Power Company´s desirable performance; less than 30 minutes on a VAX/780 mini-computer for a one-week scheduling
Keywords
hydroelectric power stations; power system analysis computing; power systems; scheduling; DDP; HSP; Taiwan power system; VAX/780 mini-computer; constrained dynamic optimization problems; differential dynamic programming algorithm; efficiency; hydroelectric generation scheduling problem; multiplier method; Computer applications; Constraint optimization; Dynamic programming; Dynamic scheduling; Heuristic algorithms; Hydroelectric power generation; Power system dynamics; Processor scheduling; Scheduling algorithm; Testing;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.65900
Filename
65900
Link To Document