• DocumentCode
    131838
  • Title

    Cell sites installation on medium voltage energized power lines

  • Author

    Ramos, Mario Angel

  • Author_Institution
    EDENOR S.A., Buenos Aires, Argentina
  • fYear
    2014
  • fDate
    21-23 May 2014
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    This paper describes the experience of installation of cell phone antennas (Cell Sites) on towers of medium and high voltage lines at Edenor, the main Distribution Utility of Buenos Aires, Argentina. There are the several advantages for society and telecom companies: less area occupied, lower costs by using existent support structures, easy permissions management, and reduction of visual impact. A working procedure covering all technical and operational aspects was developed and established a feasible, safe, efficient and standardized work plan in order to place antennas on the medium voltage network. This paper shows the entire process and the Work Method used.
  • Keywords
    antennas; distribution networks; Argentina; Buenos Aires; Edenor; cell phone antennas; cell sites installation; distribution utility; medium voltage energized power lines; medium voltage network; Antennas; Conductors; Medium voltage; Telecommunications; Visualization; Cell sites; Hot stick method; Live Working lines; Medium voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Live Maintenance (ICOLIM), 2014 11th International Conference on
  • Conference_Location
    Budapest
  • Type

    conf

  • DOI
    10.1109/ICOLIM.2014.6934335
  • Filename
    6934335