DocumentCode
1351720
Title
Optimum Preventive Maintenance Policies for a Computer System with Restart
Author
Nakagawa, Toshio ; Nishi, Kenjiro ; Yasui, Kazumi
Author_Institution
Department of Mathematics; Meijo University; Nagoya 468 JAPAN.
Issue
4
fYear
1984
Firstpage
272
Lastpage
276
Abstract
This paper considers a computer system where an operation is restarted when the system stops on some faults. The restart does not succeed every time. Three preventive maintenance (pm) models are considered: A) The pm is made at the scheduled time T. B) The pm is made at the K-th successful restart. C) The pm is made at the next scheduled time if the total number of successes of restart exceeds K. The availabilities of each model are obtained and the optimum pm policies are discussed.
Keywords
Art; Calculus; Error correction; Hazards; Power system modeling; Preventive maintenance; Probability; Processor scheduling; Stochastic systems; Temperature; Availability; Computer system; Optimum policy; Preventive maintenance;
fLanguage
English
Journal_Title
Reliability, IEEE Transactions on
Publisher
ieee
ISSN
0018-9529
Type
jour
DOI
10.1109/TR.1984.5221819
Filename
5221819
Link To Document