DocumentCode
1354325
Title
Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study
Author
Arinez, Jorge ; Biller, Stephan ; Meerkov, Semyon M. ; Zhang, Liang
Author_Institution
GM R&D & Planning, Gen. Motors Corp., Warren, MI, USA
Volume
7
Issue
4
fYear
2010
Firstpage
755
Lastpage
761
Abstract
This paper describes the design and implementation of a continuous improvement project at an automotive paint shop. The development is based on a recently developed improvement methodology for production systems with quality-quantity coupled operations, whereby increasing the probability to complete a job during a cycle time leads to decreasing job quality. The implementation of the first stage of the project resulted in over 9% throughput improvement. The second stage predicts additional improvement of 9.5%.
Keywords
automobile industry; continuous improvement; painting; automotive paint shop; continuous improvement project; job quality; production system; quality improvement; quantity improvement; Automotive engineering; Continuous improvement; Interference; Job production systems; Manuals; Modeling; Paints; Production facilities; Production systems; Throughput; Bernoulli reliability and quality models; bottleneck (BN); continuous improvement; paint shop; quality-quantity coupling (QQC);
fLanguage
English
Journal_Title
Automation Science and Engineering, IEEE Transactions on
Publisher
ieee
ISSN
1545-5955
Type
jour
DOI
10.1109/TASE.2009.2033568
Filename
5352317
Link To Document