• DocumentCode
    1354325
  • Title

    Quality/Quantity Improvement in an Automotive Paint Shop: A Case Study

  • Author

    Arinez, Jorge ; Biller, Stephan ; Meerkov, Semyon M. ; Zhang, Liang

  • Author_Institution
    GM R&D & Planning, Gen. Motors Corp., Warren, MI, USA
  • Volume
    7
  • Issue
    4
  • fYear
    2010
  • Firstpage
    755
  • Lastpage
    761
  • Abstract
    This paper describes the design and implementation of a continuous improvement project at an automotive paint shop. The development is based on a recently developed improvement methodology for production systems with quality-quantity coupled operations, whereby increasing the probability to complete a job during a cycle time leads to decreasing job quality. The implementation of the first stage of the project resulted in over 9% throughput improvement. The second stage predicts additional improvement of 9.5%.
  • Keywords
    automobile industry; continuous improvement; painting; automotive paint shop; continuous improvement project; job quality; production system; quality improvement; quantity improvement; Automotive engineering; Continuous improvement; Interference; Job production systems; Manuals; Modeling; Paints; Production facilities; Production systems; Throughput; Bernoulli reliability and quality models; bottleneck (BN); continuous improvement; paint shop; quality-quantity coupling (QQC);
  • fLanguage
    English
  • Journal_Title
    Automation Science and Engineering, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1545-5955
  • Type

    jour

  • DOI
    10.1109/TASE.2009.2033568
  • Filename
    5352317