DocumentCode
135554
Title
Overload strategy of transmission and transformation equipment for safety operation
Author
Yinuo Huang ; Chuangxin Guo ; Yunfeng Wen ; Yue Wang ; Xiang Zhang ; Jinjiang Zhang
Author_Institution
Coll. of Electr. Eng., Zhejiang Univ., Hangzhou, China
fYear
2014
fDate
27-31 July 2014
Firstpage
1
Lastpage
5
Abstract
Due to the continuing need for power demand, it´s necessary to increase the utilization of existing transmission and transformation equipment. To achieve that point, overload strategies under safe operation are discussed in this paper. Since dynamic line rating (DLR) is considered, the capacity and resistance of the overhead line, as well as risk of the power grid are all calculated under real-time environment and actual line situation. Overhead lines´ overload strategy is proposed with the precondition of risk not exceeding the risk value calculated in the traditional method. In addition, transformers´ overload operation needs to be applied in some scenarios. Overload strategy of transformers is also discussed under the limits of winding hot spot temperature and failure rate in our study, to ensure the reliability and safety. Finally, the validity of our overload strategy is illustrated by a series of simulations.
Keywords
electrical safety; power grids; power overhead lines; power transformers; reliability; transformer windings; dynamic line rating; failure rate; overhead line overload strategy; power grid; safety operation; transformation equipment; transformer overload strategy; winding hot spot temperature; Educational institutions; Oil insulation; Power system dynamics; Power transformer insulation; Risk management; Windings; dynamic line rating; overhead lines; overload strategy; transformers;
fLanguage
English
Publisher
ieee
Conference_Titel
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location
National Harbor, MD
Type
conf
DOI
10.1109/PESGM.2014.6939451
Filename
6939451
Link To Document