DocumentCode
135624
Title
Commissioning tests of 100kWh battery energy storage system for a distribution test line
Author
Awan, Farah ; Abbey, Craig ; Brissette, Yves ; Joos, Geza
Author_Institution
Dept. of Electr. & Comput. Eng., McGill Univ., Montréal, QC, Canada
fYear
2014
fDate
27-31 July 2014
Firstpage
1
Lastpage
4
Abstract
Recent advancements in energy storage systems have provided viable solutions to challenges posed by the evolving grid. Electric grid related energy storage applications include energy time-shift, upgrade deferral for transmission and distribution network infrastructure and energy management services. In the microgrid context, energy storage can enable a higher penetration of renewable energy sources. In this regard, a battery energy storage system (BESS) has been set on the distribution test line in Varennes to study the potential applications of a BESS in a distribution network. This paper describes the installation, electrical characteristics and operation modes of the 100 kWh Lithiumion BESS. Results of the commissioning tests are presented and discussed.
Keywords
battery management systems; battery storage plants; distributed power generation; distribution networks; power grids; battery energy storage system; commissioning tests; distribution network infrastructure; distribution test line; electric grid; energy management services; energy time-shift; lithium-ion BESS; microgrid context; renewable energy sources; Batteries; Discharges (electric); Inverters; Monitoring; System-on-chip; Voltage control; AC-DC power converters; Energy storage; battery management systems (BMS);
fLanguage
English
Publisher
ieee
Conference_Titel
PES General Meeting | Conference & Exposition, 2014 IEEE
Conference_Location
National Harbor, MD
Type
conf
DOI
10.1109/PESGM.2014.6939496
Filename
6939496
Link To Document