DocumentCode
1358945
Title
Hydro system scheduling using ANN approach
Author
Naresh, R. ; Sharma, J.
Author_Institution
Dept. of Electr. Eng., Roorkee Univ., India
Volume
15
Issue
1
fYear
2000
fDate
2/1/2000 12:00:00 AM
Firstpage
388
Lastpage
395
Abstract
This paper presents a two-phase artificial neural network approach for ending optimal scheduling of interconnected hydropower plants. In this approach the objective is to maximize hydropower generation and to satisfy the irrigation requirement as far as possible. A case study considering scheduling of Bhakra-Beas interconnected reservoir system is also presented in this paper. The proposed technique is compared with augmented penalty function methodology and demonstrates the potential of achieving better results
Keywords
hydroelectric power stations; neural nets; power engineering computing; power generation scheduling; ANN approach; Bhakra-Beas interconnected reservoir system; Lagrange multipliers; augmented penalty function; hydro system scheduling; hydropower generation maximisation; interconnected hydropower plants; minimum energy; operation planning; optimal scheduling ending; two-phase artificial neural network; two-phase neural network; Artificial neural networks; Dynamic programming; Hydroelectric power generation; Job shop scheduling; Linear programming; Neural networks; Optimal scheduling; Power system planning; Reservoirs; Water resources;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.852149
Filename
852149
Link To Document