  • Title

    Variations in area- and time-specific marginal capacity costs of electricity distribution

  • Author

    Heffner, Grayson ; Woo, C.K. ; Horii, Brian ; Lloyd-Zannetti, Debra

  • Author_Institution
    Customer Syst. Div., Electr. Power Res. Inst., Washington, DC, USA
  • Volume
    13
  • Issue
    2
  • fYear
    1998
  • fDate
    5/1/1998 12:00:00 AM
  • Firstpage
    560
  • Lastpage
    567
  • Abstract
    Marginal costs of electricity vary by time and location. Past researchers attributed these variations to factors related to electricity generation and transmission. Those authors, however, did not fully analyze the large variations in marginal distribution capacity costs (MDCC) by area and time. Thus, the objectives of this paper are: (1) to propose a method to estimate MDCC; (2) to demonstrate the significant intra- and inter-utility variations in MDCC; and (3) to discuss the usefulness of these cost estimations in integrated resource planning
  • Keywords
    costing; distribution networks; economics; electricity supply industry; cost estimations; electricity distribution; integrated resource planning; inter-utility transactions; intra-utility transactions; location; marginal capacity costs; time; Costs; Dispatching; Environmental economics; Investments; Power generation; Power markets; Power system planning; Pricing; Production; Timing;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.667383
  • Filename
    667383