DocumentCode
1377516
Title
Measuring 1,800,000-Kw demand
Author
Morris, J. A. ; Thomas, H. C.
Author_Institution
American Gas and Electric Service Corporation, New York, N. Y.
Volume
75
Issue
1
fYear
1956
fDate
3/1/1956 12:00:00 AM
Firstpage
95
Lastpage
97
Abstract
A PAPER presented by Sporn and Marquis1 in 1954 outlines quite specifically practically all phases of the economic, engineering, and financing problems in connection with the supply of 1,800,000 kw of power to the Atomic Energy Commission Portsmouth Area. The measurement of the electrical quantities of this load, to satisfy the contractual requirements, created a number of additional problems, not usually encountered in the measurement of power and energy.
Keywords
Clocks; Companies; Contacts; Printing; Shafts; Switches; Windings;
fLanguage
English
Journal_Title
American Institute of Electrical Engineers, Part I: Communication and Electronics, Transactions of the
Publisher
ieee
ISSN
0097-2452
Type
jour
DOI
10.1109/TCE.1956.6372492
Filename
6372492
Link To Document