DocumentCode
1405998
Title
Interconnection of the 25- and 60-cycle system of the union electric light & power co.
Author
Nelson, L. V. ; Hough, E. L.
Author_Institution
Union Electric Light & Power Co., St. Louis, Mo.
Volume
50
Issue
11
fYear
1931
Firstpage
901
Lastpage
901
Abstract
FREQUENCY conversion was determined as the best means of supplying differences between the 25-cycle and 60-cycle loads and generating abilities of the Union Electric Light and Power Company system. The hydroelectric plant at Keokuk, Iowa, was developed as a 25-cycle run-of-river plant to supply the 25-cycle load in that vicinity and to transmit power to St. Louis, where the load is largely 60 cycles. Various possibilities in 25-cycle and 60-cycle steam and hydroelectric plants presented themselves but a frequency converter was decided upon as the most desirable.
Keywords
Arresters; Generators; Lightning; Power cables; Regulators; Substations; Voltage control;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1931.6429514
Filename
6429514
Link To Document