• DocumentCode
    1421589
  • Title

    Power arc-over on overhead distribution lines and newly developed equipment for protection against conductor burndown from that cause

  • Author

    Matthews, G. A.

  • Author_Institution
    Electrical system, The Detroit Edison Company, Detroit, Mich.
  • Volume
    60
  • Issue
    6
  • fYear
    1941
  • fDate
    6/1/1941 12:00:00 AM
  • Firstpage
    596
  • Lastpage
    604
  • Abstract
    With conventional types of switchgear and customary methods of circuit operation, power arc-overs resulting from transient faults on overhead primary lines cause unnecessary burndown of conductors and undesired operation of fuses. The majority of faults on overhead distribution circuits are of transient nature.
  • Keywords
    Circuit faults; Conductors; Copper; Fault currents; Fuses; Transient analysis; Wires;
  • fLanguage
    English
  • Journal_Title
    Electrical Engineering
  • Publisher
    ieee
  • ISSN
    0095-9197
  • Type

    jour

  • DOI
    10.1109/EE.1941.6432200
  • Filename
    6432200