DocumentCode
1435357
Title
Relative accuracy of three-phase metering combinations
Author
Weller, C. T.
Author_Institution
General Electric Company, Schenectady, N. Y.
Volume
60
Issue
10
fYear
1941
Firstpage
925
Lastpage
928
Abstract
This paper grades several three-phase combinations of instrument transformers and watthour meters under various conditions according to their approach to the best standard practice. The combinations are described and sources of uncertainty or of error are discussed. Diagrams are included to show the schematic connections of the component transformers and meters, both separately and in combination and of the power systems to be metered.
Keywords
Accuracy; Current transformers; Standards; Voltage transformers; Watthour meters;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1941.6434508
Filename
6434508
Link To Document