DocumentCode
1439534
Title
Mingled hydro and steam power production in California — Past, present, and future
Author
Markwart, A. H.
Author_Institution
Pacific Gas and Electric Company, San Francisco, Calif.
Volume
59
Issue
12
fYear
1940
Firstpage
775
Lastpage
781
Abstract
THE development in the United States of the central-station industry from its inception in San Francisco in 1879 and in New York in 1882, to the present, has been made in two broad phases. The initial or pioneer phase includes the first isolated steam-electric plants serving lighting customers, followed by small hydroelectric plants serving nearby customers and later (in Oregon in 1889) with the development of higher transmission voltages, serving customers remote from the generating plants. Mingled steam and hydro power was inaugurated in 1895 when the Folsom hydroelectric plant was connected to a steam-electric plant at Sacramento. In 1899, also at Sacramento, and again in the San Francisco Bay region in 1902, distant hydroelectric plants were connected with each other and with local steam plants. It may be said that these interconnections of remote hydro supplies with steam-electric plants culminated the initial phase.
Keywords
Companies; Government; Irrigation; Meteorology; Production; Reservoirs; Rivers;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1940.6435239
Filename
6435239
Link To Document