DocumentCode
1460826
Title
Magamp regulator tests and operating experience
Author
Hand, E. W. ; McClure, F. N. ; Bobo, P. O. ; Carleton, J. T.
Author_Institution
West Penn Power Company, Pittsburgh, Pa.
Volume
73
Issue
5
fYear
1954
fDate
5/1/1954 12:00:00 AM
Firstpage
427
Lastpage
427
Abstract
THE FIRST INSTALLATION of the Magamp regulator and excitation system on a turbine generator was placed in service in the Springdale Station of the West Penn Power Company on April 1, 1953. The machine to which it was applied is a 50,000-kw 3,600-rpm hydrogen-cooled topping unit. Performance tests were conducted on the unit on July 19, 1953. The purpose of this digest is to present the operating experience and the results of the tests.
Keywords
Companies; Damping; Generators; Magnetic separation; Regulators; Steel; Voltage control;
fLanguage
English
Journal_Title
Electrical Engineering
Publisher
ieee
ISSN
0095-9197
Type
jour
DOI
10.1109/EE.1954.6438761
Filename
6438761
Link To Document