• DocumentCode
    1472246
  • Title

    Single machine scheduling with chain: structured precedence constraints and separation time windows

  • Author

    Chu, Chengbin ; Proth, Jean-marie

  • Author_Institution
    Projet SAGEP, INRIA-Lorraine, Metz, France
  • Volume
    12
  • Issue
    6
  • fYear
    1996
  • fDate
    12/1/1996 12:00:00 AM
  • Firstpage
    835
  • Lastpage
    844
  • Abstract
    We consider a single machine scheduling problem which we studied to improve the efficiency of an automated medical laboratory. In this problem, there are not only chain structured precedence constraints, but also minimal and maximal times separating successive jobs in the same chain (separation time windows). The criterion to be minimized is the makespan. Potential applications are not restricted to medical analysis. This problem often arises in systems where chemical processes are involved. Therefore the problem studied in this paper is important in practice. We prove that the problem is nonpolynomial (NP)-complete. As a consequence, we propose three heuristics for large size problems and a branch and bound based algorithm for small size problems. Computational results are reported
  • Keywords
    chemical industry; computational complexity; laboratories; optimisation; production control; scheduling; automated medical laboratory; branch and bound; efficiency; heuristics; makespan minimisation; nonpolynomial NP-complete problem; separation time windows; single machine scheduling; structured precedence constraint; Chemical elements; Chemical processes; Diseases; Laboratories; Medical robotics; Performance analysis; Robots; Single machine scheduling; Testing; Time factors;
  • fLanguage
    English
  • Journal_Title
    Robotics and Automation, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1042-296X
  • Type

    jour

  • DOI
    10.1109/70.544767
  • Filename
    544767