DocumentCode
1487200
Title
A Two-Level Genetic Algorithm to Determine Production Frequencies for Economic Lot Scheduling Problem
Author
Chung, Sai Ho ; Chan, Hing Kai
Author_Institution
Hong Kong Polytech. Univ., Hong Kong, China
Volume
59
Issue
1
fYear
2012
Firstpage
611
Lastpage
619
Abstract
The economic lot scheduling problem (ELSP) has been studied over 50 years. ELSP is known as NP-hard and hence heuristic algorithms have been developed. In those heuristics, researchers generally adopted two types of rounding-off methods for the production frequency of products, namely, the nearest integer and power-of-two approaches. The production frequency of products defines the number of times that such product being produced during the cycle. Therefore, different production frequency actually leads to different optimization results even for the same set of products. For this reason, this paper proposes a two-level genetic algorithm to deal with this problem. A number of numerical examples found in literature and randomly generated problem sets are used to test and benchmark the performance of the new approach. The comparison shows that the new approach outperforms the other existing approaches and also demonstrates the significance of the production frequency to the optimization results.
Keywords
genetic algorithms; production management; scheduling; economic lot scheduling problem; heuristic algorithms; optimization results; production frequencies; rounding-off methods; two-level genetic algorithm; Benchmark testing; Biological cells; Genetic algorithms; Heuristic algorithms; Mathematical model; Production; Economic lot scheduling problem (ELSP); genetic algorithm (GA); inventory management; supply chain;
fLanguage
English
Journal_Title
Industrial Electronics, IEEE Transactions on
Publisher
ieee
ISSN
0278-0046
Type
jour
DOI
10.1109/TIE.2011.2130498
Filename
5741841
Link To Document