DocumentCode
1506154
Title
Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing Systems: Software Tool and Simulation Case Studies
Author
Ramírez-Hernández, José A. ; Crabtree, Jason ; Yao, Xiaodong ; Fernandez, Emmanuel ; Fu, Michael C. ; Janakiram, Mani ; Marcus, Steven I. ; O´Connor, Matilda ; Patel, Nipa
Author_Institution
Dept. of Electr. & Comput. Eng., Univ. of Cincinnati, Cincinnati, OH, USA
Volume
23
Issue
3
fYear
2010
Firstpage
477
Lastpage
489
Abstract
This paper presents the architecture and implementation of a preventive maintenance optimization software tool (PMOST), based on algorithms for the optimal scheduling of preventive maintenance (PM) tasks in semiconductor manufacturing operations. We also present results from four complex simulation case studies, based on real industrial data and employing full fab models, to illustrate the use, data needs and outcomes produced by PMOST. These results demonstrate significant improvements in tool production and consolidation of PM tasks. We give a description of the different software modules that compose PMOST, to provide guidelines as well as a template for other implementations of the PM optimization algorithms utilized by PMOST.
Keywords
optimisation; preventive maintenance; production engineering computing; scheduling; semiconductor device manufacture; software tools; PM optimization algorithms; PMOST; optimal preventive maintenance scheduling; optimal scheduling; semiconductor manufacturing operations; semiconductor manufacturing systems; software modules; software tool; Optimal preventive maintenance (PM) scheduling; simulation case studies; software tool;
fLanguage
English
Journal_Title
Semiconductor Manufacturing, IEEE Transactions on
Publisher
ieee
ISSN
0894-6507
Type
jour
DOI
10.1109/TSM.2010.2051731
Filename
5475204
Link To Document