• DocumentCode
    1507314
  • Title

    Planning, mobility, and counter guerrilla warfare

  • Author

    Rubin, T. J. ; Hitchman, Norman

  • Author_Institution
    General Electric Co., Santa Barbara, Calif.
  • Issue
    2
  • fYear
    1964
  • fDate
    6/1/1964 12:00:00 AM
  • Firstpage
    63
  • Lastpage
    74
  • Abstract
    The process of solution identification is defined and structured as one of the four key components of the R & D planning process. Within the process some workable concepts of mobility are derived relating to the time factor in military operations. Data for the ballistic projectile hardware family are used to illustrate mobility capabilities. The counter guerrilla strategy of reaction to guerrilla actions is discussed and illustrative mobility requirements resulting from the strategy are displayed. A counter guerrilla system is deduced functionally and its mobility component is highlighted. Finally, the system feasibility test is described for the counter guerrilla mission, both for single targets and target complexes.
  • Keywords
    Hardware; Operations research; Performance evaluation; Planning; Projectiles; Time factors;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9391
  • Type

    jour

  • DOI
    10.1109/TEM.1964.6446399
  • Filename
    6446399