DocumentCode
1533359
Title
Multiresource Shop Scheduling With Resource Flexibility and Blocking
Author
Mati, Yazid ; Xie, Xiaolan
Author_Institution
Coll. of Bus. & Econ., Al-Qassim Univ., Buraidah, Saudi Arabia
Volume
8
Issue
1
fYear
2011
Firstpage
175
Lastpage
189
Abstract
This paper proposes a general scheduling model that extends job-shop scheduling models to incorporate important features of real manufacturing systems. More precisely, each operation can be performed in different modes and requires a different set of resources depending on the mode. Further, we consider blocking constraints that requires to hold resources used for an operation till resources needed for the next operation of the same job are available. A shortest path approach extending the classical geometric approach is proposed for the two-job case. A greedy heuristic is then proposed to schedule N jobs by considering jobs sequentially, grouping scheduled jobs into a combined job and then scheduling it and the next unscheduled job using the shortest path approach. A metaheuristic is then used to identify effective job sequences. Extensive numerical experimentation proves the efficiency of our approach.
Keywords
job shop scheduling; manufacturing systems; resource allocation; greedy heuristic approach; job shop scheduling model; manufacturing system; multiresource shop scheduling; resource blocking; resource flexibility; shortest path approach; Aircraft manufacture; Chemical industry; Job shop scheduling; Machinery production industries; Manufacturing automation; Manufacturing systems; Material storage; Materials handling; Production systems; System recovery; Blocking; deadlock; geometric approach; makespan; multiresource; resource flexibility; scheduling;
fLanguage
English
Journal_Title
Automation Science and Engineering, IEEE Transactions on
Publisher
ieee
ISSN
1545-5955
Type
jour
DOI
10.1109/TASE.2010.2052356
Filename
5508366
Link To Document