• DocumentCode
    1536416
  • Title

    Goal programming approach to maintenance scheduling of generating units in large scale power systems

  • Author

    Moro, Lucía Muñoz ; Ramos, Andrés

  • Author_Institution
    Inst. de Invest. Tecnologica, Univ. Pontifica Comillas, Madrid, Spain
  • Volume
    14
  • Issue
    3
  • fYear
    1999
  • fDate
    8/1/1999 12:00:00 AM
  • Firstpage
    1021
  • Lastpage
    1028
  • Abstract
    This paper presents a goal programming methodology for solving maintenance scheduling of thermal generating units under economic and reliability criteria. The advantages of a multicriteria approach are demonstrated by comparing the effects that costs and reliability have on each other in power plants maintenance scheduling. The problem is formulated as a large scale mixed integer programming problem implemented in the mathematical programming language GAMS and solved using OSL. Weekly maintenance scheduling of the large scale Spanish power system for a year period illustrates the proposed methodology
  • Keywords
    integer programming; maintenance engineering; power generation planning; scheduling; thermal power stations; GAMS mathematical programming language; OSL; Spain; costs; goal programming approach; large-scale mixed integer programming problem; large-scale power systems; maintenance scheduling; multicriteria approach; reliability; thermal generating units; weekly maintenance; Constraint optimization; Costs; Large-scale systems; Maintenance; Power generation; Power system modeling; Power system planning; Power system reliability; Power systems; Scheduling;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.780915
  • Filename
    780915