DocumentCode
1546234
Title
Efficient testing of substation panels
Author
Ironside, K. ; Kibart, Bill
Volume
15
Issue
5
fYear
2001
Firstpage
233
Lastpage
238
Abstract
The task of testing protection devices and control panels used in major projects has been exacerbated by increasing complexity and the extra functionality that they provide. The use of modern automated test equipment can address this added complexity and, at the same time, speed up the whole process. An example of where this approach has been very beneficial to the contractor was associated with the undersea 90 kV links between England and the Isle of Man. The authors describe the project. Automatic tap change control, system frequency, synchronisation, and protection panels are discussed.
Keywords
automatic test equipment; power system control; power system protection; substations; synchronisation; 90 kV; England to Isle of Man link; automated test equipment; automatic tap change control; control panels testing; protection devices testing; protection panels; substation panels testing; synchronisation; system frequency;
fLanguage
English
Journal_Title
Power Engineering Journal
Publisher
iet
ISSN
0950-3366
Type
jour
DOI
10.1049/pe:20010505
Filename
962696