• DocumentCode
    1570305
  • Title

    A probabilistic reserve with zero-sum settlement scheme

  • Author

    Xia, L.M. ; Booi, H.B. ; Bai, J.

  • Author_Institution
    Nanyang Technol. Univ., Singapore
  • fYear
    2005
  • Abstract
    Summary form only given. A probabilistic reserve scheme with iterated linear programming is proposed to maintain a uniform system reliability level in each dispatch period. Besides, a new zero-sum settlement scheme is introduced. It maintains a net zero sum of payment (loss) and compensation (gain) among the online generators by considering the expected energy not served (EENS) or reserve responsibility share of each unit. Solution results of the IEEE 26-unit system have revealed that the combined probabilistic reserve and zero-sum settlement scheme gives the Gencos stimuli to enhance their performance.
  • Keywords
    linear programming; power generation economics; power generation reliability; Gencos; expected energy not served; iterated linear programming; online generators; probabilistic reserve; reserve responsibility share; system reliability; the IEEE 26-unit system; zero-sum settlement scheme; Linear programming; Maintenance; Reliability;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering Society General Meeting, 2005. IEEE
  • Print_ISBN
    0-7803-9157-8
  • Type

    conf

  • DOI
    10.1109/PES.2005.1489094
  • Filename
    1489094