DocumentCode
1570305
Title
A probabilistic reserve with zero-sum settlement scheme
Author
Xia, L.M. ; Booi, H.B. ; Bai, J.
Author_Institution
Nanyang Technol. Univ., Singapore
fYear
2005
Abstract
Summary form only given. A probabilistic reserve scheme with iterated linear programming is proposed to maintain a uniform system reliability level in each dispatch period. Besides, a new zero-sum settlement scheme is introduced. It maintains a net zero sum of payment (loss) and compensation (gain) among the online generators by considering the expected energy not served (EENS) or reserve responsibility share of each unit. Solution results of the IEEE 26-unit system have revealed that the combined probabilistic reserve and zero-sum settlement scheme gives the Gencos stimuli to enhance their performance.
Keywords
linear programming; power generation economics; power generation reliability; Gencos; expected energy not served; iterated linear programming; online generators; probabilistic reserve; reserve responsibility share; system reliability; the IEEE 26-unit system; zero-sum settlement scheme; Linear programming; Maintenance; Reliability;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489094
Filename
1489094
Link To Document