• DocumentCode
    1571055
  • Title

    Intelligent multi-machine scheduling on tasks with variable switch time

  • Author

    Lei, Fei ; Zou, Yiren ; Zeng, Feng

  • Author_Institution
    Inst. of Autom., Chinese Acad. of Sci., Beijing, China
  • Volume
    4
  • fYear
    2004
  • Firstpage
    2958
  • Abstract
    To find an optimal multi-machine schedule for a set of tasks with variable switch time, an optimal model was proposed, and a new intelligent algorithm with an adaptive structure was designed for less delay time and higher quality of service. If the server is under low average load, it used genetic algorithm and advanced greedy algorithm jointly to achieve a minimum task abandon ratio and a maximum task value, or else only advanced greedy algorithm was used to minimize delay time. The scheduler adopted runtime incremental parallel scheduling (RIPS) strategy, which combines the advantages of static and dynamic scheduling. The several simulation experiments show that the proposed schedule algorithm is valid and feasible.
  • Keywords
    algorithm theory; dynamic scheduling; genetic algorithms; task analysis; advanced greedy algorithm; dynamic scheduling; genetic algorithm; intelligent multimachine scheduling; maximum task value; minimum task abandon ratio; quality of service; runtime incremental parallel scheduling strategy; static scheduling; variable switch time; Algorithm design and analysis; Delay effects; Dynamic scheduling; Genetic algorithms; Greedy algorithms; Intelligent structures; Quality of service; Runtime; Scheduling algorithm; Switches;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Control and Automation, 2004. WCICA 2004. Fifth World Congress on
  • Print_ISBN
    0-7803-8273-0
  • Type

    conf

  • DOI
    10.1109/WCICA.2004.1343058
  • Filename
    1343058