DocumentCode
1576209
Title
Scheduling with resource allocation and past-sequence-dependent setup times including maintenance
Author
Zhu, Zhanguo ; Chu, Feng ; Sun, Linyan ; Liu, Ming
fYear
2011
Firstpage
383
Lastpage
387
Abstract
In this work, scheduling problems with resource allocation and past-sequence-dependent (p-s-d) setup times are considered. Under these settings, the actual job processing times are dependent on the amount of resource allocated and the setup times are proportionate to the length of the already processed jobs. The objective function is a combination of the total completion time and the total resource consumption. In addition, the machine may need maintenance to improve its production efficiency, so the maintenance is also integrated. The optimal job sequence, the optimal amount of resource allocated to each job, and the optimal maintenance position are determined jointly. It is shown that the problem under study is polynomial time solvable.
Keywords
job production systems; maintenance engineering; polynomials; production control; resource allocation; scheduling; job processing times; optimal job sequence; optimal maintenance position; past-sequence-dependent setup times; polynomial time solvable; production efficiency; resource allocation; scheduling; total resource consumption; Equations; Europe; Job shop scheduling; Maintenance engineering; Processor scheduling; Resource management; Single machine scheduling;
fLanguage
English
Publisher
ieee
Conference_Titel
Networking, Sensing and Control (ICNSC), 2011 IEEE International Conference on
Conference_Location
Delft
Print_ISBN
978-1-4244-9570-2
Type
conf
DOI
10.1109/ICNSC.2011.5874920
Filename
5874920
Link To Document