DocumentCode
1577081
Title
A method of load forecasting for January and February in China
Author
Wang, C. ; Xu, Z. ; Zhu, T.X.
Author_Institution
Dept. of Electr. Eng., Zhejiang Univ., Hangzhou, China
fYear
2005
Firstpage
2141
Abstract
In China, the electricity demand of January and February is significantly different from the other months. If we forecast the load of the two months by traditional methods, there will be large errors, which can lead to adverse conclusions in power system analysis. To solve this problem, a method to forecast the load of the two months is proposed: First, we evaluate the total load of the two months by traditional methods; Second, we calculate the ratio between the load of January and February by an algorithm based on analogy and approximation with manual-adjust; Third, we forecast the load of the two months respectively. In this way, we can eliminate the forecasting error caused by the holiday of Chinese New Year. An actual example shows this method is effective for the load forecasting in January and February.
Keywords
load forecasting; China; Chinese New Year; February; January; electricity demand; load forecasting; power system analysis; Approximation algorithms; Calendars; Fluctuations; Load forecasting; Load modeling; Power system analysis computing; Power system modeling; Power system planning; Power system reliability; Power transmission;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2005. IEEE
Print_ISBN
0-7803-9157-8
Type
conf
DOI
10.1109/PES.2005.1489376
Filename
1489376
Link To Document