• DocumentCode
    1597520
  • Title

    A reliability initiative that actually justifies funding and makes measurable improvements

  • Author

    Jones, Joshua B.

  • Author_Institution
    Rocky Mountain Power, Salt Lake City, UT, USA
  • fYear
    2009
  • Firstpage
    1
  • Lastpage
    7
  • Abstract
    The old saying ldquoParalysis by Analysisrdquo seems to hold true for many reliability initiatives. Too many times there is so much analysis to point us in a direction that by the end of all that analysis we lose out on the opportunity to make the corrections using current and timely data. This paper describes how one company structured a reliability initiative from the ground up to make the reliability data understandable and actionable. When applied to other companies, the improvements discussed in this paper will vary, depending on the types of outages experienced. The real goal by defining or re-defining a program from the ground up, is to take reliability improvements back to the basics and improve service to customers.
  • Keywords
    power system reliability; customer average interruption duration index; reliability enhancement analysis tool; system average interruption duration index; system average interruption frequency index; Control systems; Data engineering; Dispatching; Engineering management; Frequency; Investments; Personnel; Reliability engineering; Switches; Voltage; CEMI; Reliability; SAIDI; SAIFI; culture change;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power & Energy Society General Meeting, 2009. PES '09. IEEE
  • Conference_Location
    Calgary, AB
  • ISSN
    1944-9925
  • Print_ISBN
    978-1-4244-4241-6
  • Type

    conf

  • DOI
    10.1109/PES.2009.5276003
  • Filename
    5276003