• DocumentCode
    1599299
  • Title

    Research on Risk in Long-Term Reservoir Dynamic Probability Scheduling

  • Author

    Li, Cailin ; Xu, Huijun ; Yuan, Xiaohui

  • Author_Institution
    Huazhong Univ. of Sci. & Technol., Wuhan
  • Volume
    5
  • fYear
    2007
  • Firstpage
    84
  • Lastpage
    87
  • Abstract
    This paper presents the concept of engineering risk, the algorithm of mean first order second moment (MFOSM) and the approach for long-term reservoir dynamic probability scheduling (LRDPS). MFOSM is applied to study the current stage risk in LRDPS and the risk analysis model is built up for corresponding annual scheduling. Tested in Dan Jiangkou plant, which belongs to Central China Power Grid, the experiment shows that the approach is feasible and can be the assistance of scheduling decision.
  • Keywords
    dynamic scheduling; probability; reservoirs; risk analysis; MFOSM algorithm; engineering risk analysis model; long-term reservoir dynamic probability scheduling; mean first order second moment; Accidents; Dynamic scheduling; Educational institutions; Hydroelectric power generation; Power engineering and energy; Reliability engineering; Reservoirs; Risk analysis; Safety; Water resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Natural Computation, 2007. ICNC 2007. Third International Conference on
  • Conference_Location
    Haikou
  • Print_ISBN
    978-0-7695-2875-5
  • Type

    conf

  • DOI
    10.1109/ICNC.2007.629
  • Filename
    4344815