MaSO: A tool for aiding the management of schedule overrun
Author
Jeet, Kawal ; Dhir, Renu ; Mago, Vijay Kumar ; Minhas, Rajindar Singh
Author_Institution
Dept. of Comput. Sci., DAV Coll., Jalandhar, India
fYear
2010
Firstpage
416
Lastpage
421
Abstract
Curbing schedule slippage is a daunting task in software industry. This problem evolves mainly because of poor analysis of risk factors and their management. This paper aims to handle this predicament with the help of Influence Diagram (ID). The three main risk factors that adversely affect the schedule are creeping user requirements, requirement instability and use of unnecessary features in the project. An integration of impacts of these with experts´ opinion and with the existing databases (consisting of probability of occurrence of risk factors) helped us to create an ID based system that is capable to model the schedule slippage. This system can be used by the software manager at any stage of software development.
Keywords
formal specification; formal verification; project management; risk analysis; software management; software tools; MaSO; influence diagram; project management; requirement instability; risk analysis; risk management; schedule overrun; schedule slippage; software development; software industry; user requirements; Computer industry; Computer science; Delay; Educational institutions; Java; Job shop scheduling; Processor scheduling; Risk analysis; Risk management; Software development management; Bayesian Network; Influence Diagram; K2 Algorithm; Risk Management; Schedule Management; Schedule Overrun; Software Developmen;
fLanguage
English
Publisher
ieee
Conference_Titel
Advance Computing Conference (IACC), 2010 IEEE 2nd International
Conference_Location
Patiala
Print_ISBN
978-1-4244-4790-9
Electronic_ISBN
978-1-4244-4791-6
Type
conf
DOI
10.1109/IADCC.2010.5422909
Filename
5422909
Link To Document