• DocumentCode
    1651055
  • Title

    Effect of a 12-hour/day shift on performance

  • Author

    Lewis, Paul M. ; Swaim, Dan J.

  • Author_Institution
    Pacific Northwest Lab., Richland, WA, USA
  • fYear
    1988
  • Firstpage
    513
  • Lastpage
    516
  • Abstract
    The operating crews at the Fast Flux Facility near Richland, Washington, changed their rotating shift schedule from an 8- to a 12-hour/day work schedule. The primary reason for the change was to reduce the attrition of operators by increasing their job satisfaction. A statistical analysis of 53 operator-related, off-normal events in 28 months concluded that there was no significant difference in either the number or the severity of off-normal events on the 12-hour shift. A statistical analysis of 200000 log entries concluded that the error rate in completing logs actually declined the 25% on the 12-hour shift. Alertness, which was measured using computerized tests of mathematics and logical reasoning, reach a nadir on the first night shift for the 8- and 12-hour schedules alike, which indicates that the primary cause of fatigue was sleep disruption, not cumulative hours of work. All supervisors and 52% of the operators believe their crews work more effectively on the 12-hour shift. Only 12% of the operators believe that their crews work less effectively.<>
  • Keywords
    human factors; nuclear power stations; personnel; USA; error rate; fatigue; human factors; operators; performance; personnel; shift schedule; statistical analysis; Error analysis; Fatigue; Industrial training; Job shop scheduling; Laboratories; Monitoring; Occupational safety; Processor scheduling; Sleep; Statistical analysis;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Human Factors and Power Plants, 1988., Conference Record for 1988 IEEE Fourth Conference on
  • Conference_Location
    Monterey, CA, USA
  • Type

    conf

  • DOI
    10.1109/HFPP.1988.27555
  • Filename
    27555