Switching operations in a high voltage substation correlated with overvoltages generated in the low voltage internal service network
Author
Agoris, D. ; Karagiannopoulos, C. ; Panos, G. ; Pyrgioti, E.
Author_Institution
Dept. of Electr. & Comput. Eng., Patras Univ., Greece
fYear
1999
Firstpage
144
Abstract
Due to problems caused to electronic devices, fed by 220 V auxiliary circuit in a 400 kV substation of the Greek HV interconnected system, extensive measurements of overvoltages have been performed, correlated with the timing of switching operations in the primary circuit of 400 kV. The investigated cases were the opening of incoming circuit breaker, the closing of coupling circuit breaker between busbars, the opening and closing of the circuit breaker of a reactor and the simultaneous opening of two coupling circuit breakers. The waveforms of the overvoltages recorded between phase and neutral had duration of about 100-200 /spl mu/s and a decaying oscillation of about 500 kHz, while their crest values were up to 6.4 kV. The overvoltages recorded between neutral and earth had values only up to 200 V.
Keywords
circuit breakers; overvoltage; power system interconnection; substations; switching; switching transients; 100 to 200 mus; 220 V; 400 kV; 500 kHz; 6.4 kV; Greece; HV interconnected system; HV substation; LV internal service network; busbars; circuit breaker; overvoltage generation; overvoltage waveforms; switching operations; Circuit breakers; Coupling circuits; Inductors; Interconnected systems; Performance evaluation; Substations; Surges; Switching circuits; Timing; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Electric Power Engineering, 1999. PowerTech Budapest 99. International Conference on
Conference_Location
Budapest, Hungary
Print_ISBN
0-7803-5836-8
Type
conf
DOI
10.1109/PTC.1999.826575
Filename
826575
Link To Document