DocumentCode
1696050
Title
An improved Least Cost Heuristic for dynamic yard crane deployment in container terminals
Author
Huang, Shell Ying ; Guo, Xi
Author_Institution
Sch. of Comput. Eng., Nanyang Technol. Univ., Singapore, Singapore
fYear
2011
Firstpage
84
Lastpage
89
Abstract
Yard Crane (YC) deployment in a multi-berth terminal is a very complex problem. The total amount of work to the entire terminal yard changes dynamically over time. The levels of workload to different parts of the yard also vary greatly and change over time. So the YC deployment algorithm plays a critical role in increasing YC productivity and reducing vehicle waiting times in the yard. This paper proposes two improved Least Cost Heuristic (LCH) algorithms. The two algorithms consider practical operation constraints and improve performance by adding weight to long waiting jobs and judicious use of YC idle time within deployment periods. We evaluate the improved algorithms against the original LCH [8] in a storage yard of practical size, under dynamically changing workload both in time and space. Experimental results show that the proposed algorithms make substantial reductions in job waiting times over the original algorithm.
Keywords
constraint theory; cranes; productivity; sea ports; transportation; YC deployment algorithm; YC idle time; YC productivity; container terminal; dynamic yard crane deployment; improved least cost heuristic algorithm; job waiting times; multiberth terminal; storage yard; vehicle waiting time reduction; Containers; Cranes; Heuristic algorithms; Loading; Planning; Productivity; Vehicles;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering (CASE), 2011 IEEE Conference on
Conference_Location
Trieste
ISSN
2161-8070
Print_ISBN
978-1-4577-1730-7
Electronic_ISBN
2161-8070
Type
conf
DOI
10.1109/CASE.2011.6042520
Filename
6042520
Link To Document