DocumentCode
1701673
Title
FACTS opportunities in England and Wales
Author
Foss, A.M.
fYear
1994
fDate
1/12/1994 12:00:00 AM
Firstpage
42552
Lastpage
42559
Abstract
The privatisation of the electricity supply industry is England and Wales in March 1990 unbundled generation, transmission and distribution. Consequently, the design and operation of the transmission system needs to be sufficiently robust and flexible to accommodate wide variations in the generation pattern. To ensure system security, a number of transmission reinforcements are required. Here, the author describes how FACTS devices offer an alternative to conventional system reinforcement with potential advantages of increased flexibility, lower cost and reduced environmental impact
fLanguage
English
Publisher
iet
Conference_Titel
Flexible AC Transmission Systems (FACTS) - The Key to Increased Utilisation of Power Systems, IEE Colloquium on (Digest No.1994/005)
Conference_Location
London
Type
conf
Filename
280273
Link To Document