• DocumentCode
    1702054
  • Title

    Too much of a good thing?-alarm management experience in BP Oil. 2. Implementation of alarm management at Grangemouth Refinery

  • Author

    O´Donnell, M. ; Brown, Donald Campbell

  • Author_Institution
    BP Oil Grangemouth Refinery, UK
  • fYear
    1997
  • fDate
    6/17/1997 12:00:00 AM
  • Firstpage
    42497
  • Lastpage
    42499
  • Abstract
    This paper reports on the BP trial of the ProSys Dynamic Configuration Software at Grangemouth Refinery. Key elements of this project to reduce alarm flooding on the catalytic reformer are described, from identification of the problem and process/operations design, through applications design and implementation, to testing and commissioning. The impact of the software is demonstrated, using data captured from real plant trips
  • Keywords
    alarm systems; BP Oil; Grangemouth Refinery; ProSys Dynamic Configuration Software; alarm flooding; alarm management; alarm management experience; applications design; catalytic reformer; commissioning; process/operations design; testing;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Stemming the Alarm Flood (Digest No: 1997/136), IEE Colloquium on
  • Conference_Location
    London
  • Type

    conf

  • DOI
    10.1049/ic:19970744
  • Filename
    663954