DocumentCode
1710880
Title
Progress in PD monitoring for insulation condition assessment of HV assets
Author
Lemke, E. ; Strehl, T.
Author_Institution
Lemke Diagnostics GmbH, Dresden, Germany
Volume
1
fYear
2005
Firstpage
269
Abstract
Currently, the evaluation of the aging process of HV assets becomes of high strategic importance, where technical aspects as well as economical and social issues have to be taken into consideration. After a general review of the information strategy applied for reliability-centered maintenance (RCM) the submitted paper deals more in detail with an advanced tool for computer-based PD monitoring of HV apparatus in service.
Keywords
computerised monitoring; condition monitoring; insulation; maintenance engineering; partial discharges; power engineering computing; power markets; reliability; HV apparatus; HV assets; computer-based PD monitoring; insulation condition assessment; reliability-centered maintenance; Aging; Asset management; Computerized monitoring; Condition monitoring; Data mining; Economic forecasting; Insulation; Power generation economics; Power system economics; Predictive maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Electrical Insulating Materials, 2005. (ISEIM 2005). Proceedings of 2005 International Symposium on
Conference_Location
Kitakyushu
Print_ISBN
4-88686-063-X
Type
conf
DOI
10.1109/ISEIM.2005.193396
Filename
1496118
Link To Document