• DocumentCode
    1712316
  • Title

    Experiment study on the rubber and fly ash of modified asphalt

  • Author

    Wei, Zhang ; Chengqin, Chen

  • Author_Institution
    Key Lab. for Special Area Highway Eng. of Minist. of Educ., Chang´an Univ., Xi´an, China
  • Volume
    4
  • fYear
    2011
  • Firstpage
    2971
  • Lastpage
    2974
  • Abstract
    This paper mainly used rubber and fly ash to modify matrix asphalt, expecting to get the reasonable rubber dosage and fly ash. The production technology of rubber asphalt, including cutting temperature, cutting time, production process, was determined by the laboratory experiment at different craft conditions according to rubber asphalt performance; The effects of different rubber particle size, dosage and fly ash dosage for modified asphalt penetration, low-temperature ductility, softening point and elastic restitution were analyzed to determine rubber particle size, optimal rubber dosage and fly ash dosage. They will affect the modified asphalt performance.
  • Keywords
    asphalt; fly ash; road building; rubber; cutting temperature; cutting time; fly ash; matrix asphalt; production process; rubber asphalt; Ash; Asphalt; Indexes; Rubber; Softening; fly ash; modified asphalt; road engineering; rubber;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Water Resource and Environmental Protection (ISWREP), 2011 International Symposium on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-61284-339-1
  • Type

    conf

  • DOI
    10.1109/ISWREP.2011.5893501
  • Filename
    5893501